{"product_id":"ieej-pe11081","title":"ダイナミックス経済負荷配分の実行可能領域","description":"\u003cp\u003e\u003cstrong\u003eカテゴリ: \u003c\/strong\u003e研究会(論文単位)\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e論文No: \u003c\/strong\u003ePE11081\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eグループ名: \u003c\/strong\u003e【B】電力・エネルギー部門 電力技術研究会\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e発行日: \u003c\/strong\u003e2011\/09\/29\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eタイトル(英語): \u003c\/strong\u003eImproved Feasible Operation Region for Dynamic Economic Load Dispatch \u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e著者名: \u003c\/strong\u003eHafiz Habibuddin(広島大学),餘利野 直人(広島大学),佐々木 豊(広島大学),造賀 芳文(広島大学)\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e著者名(英語): \u003c\/strong\u003eHafiz Habibuddin(Hiroshima University),Yorino Naoto(Hiroshima University),Sasaki Yutaka(Hiroshima University),Zoka Yoshifumi(Hiroshima University)\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eキーワード: \u003c\/strong\u003eDynamic economic dispatch|Feasible operation region|Optimization|Ramp-rate constraints\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e要約(日本語): \u003c\/strong\u003eHigh penetration of renewable energy in the future power system will pose a big problem to the load dispatch operation. The large disturbance and high forecast error must be considered when scheduling a limited number of controllable generators to follow rapid change in load. This paper proposes dynamic economic load dispatch (DELD) problem approach based on the concept of feasible operation region (FOR). FOR is defined as the region that committed generators may operate to match the load profile without violating the ramp-rate constraints. The DELD problem is solved in two stages. In the first stage, FOR of each generator is computed using recent real-time forecasted load as well as renewable energy generation. In the second stage, a generation schedule is determined by solving the DELD problem interval by interval while considering ramp-rate constraints and FOR constraints. The method can gives feasible solution for feasible load and specify the amount of compensation required for feasible solution for infeasible load.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e要約(英語): \u003c\/strong\u003eHigh penetration of renewable energy in the future power system will pose a big problem to the load dispatch operation. The large disturbance and high forecast error must be considered when scheduling a limited number of controllable generators to follow rapid change in load. This paper proposes dynamic economic load dispatch (DELD) problem approach based on the concept of feasible operation region (FOR). FOR is defined as the region that committed generators may operate to match the load profile without violating the ramp-rate constraints. The DELD problem is solved in two stages. In the first stage, FOR of each generator is computed using recent real-time forecasted load as well as renewable energy generation. In the second stage, a generation schedule is determined by solving the DELD problem interval by interval while considering ramp-rate constraints and FOR constraints. The method can gives feasible solution for feasible load and specify the amount of compensation required for feasible solution for infeasible load.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003e原稿種別: \u003c\/strong\u003e日本語\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003ePDFファイルサイズ: \u003c\/strong\u003e926 Kバイト\u003c\/p\u003e","brand":"IEEJ-PDF","offers":[{"title":"PDFダウンロード（一般価格330円\/会員価格220円） \/ A4 \/ 6","offer_id":46359555735791,"sku":"IEEJ-PE11081-PDF","price":330.0,"currency_code":"JPY","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0718\/9512\/2159\/files\/IEEJ-PDF_ccdfdfb5-1192-4326-b4a0-fa57c769575c.png?v=1743486942","url":"https:\/\/ieej.bookpark.ne.jp\/products\/ieej-pe11081","provider":"電気学会 電子図書館","version":"1.0","type":"link"}