商品情報にスキップ
1 1

Optimal voltage improvement of distribution/sub transmission network in southern Senegal

Optimal voltage improvement of distribution/sub transmission network in southern Senegal

通常価格 ¥330 JPY
通常価格 セール価格 ¥330 JPY
セール 売り切れ
税込

カテゴリ: 研究会(論文単位)

論文No: PE19091

グループ名: 【B】電力・エネルギー部門 電力技術研究会

発行日: 2019/09/19

タイトル(英語): Optimal voltage improvement of distribution/sub transmission network in southern Senegal

著者名: SALL Makhtar(University of the Ryukyus),Ahmadi Mikaeel(University of the Ryukyus ),Viegas Sergio Bernardo(University of the Ryukyus),Naomitsu Urasaki(University of the Ryukyus),Tomonobu Senju(University of the Ryukyus)

著者名(英語): Makhtar SALL(University of the Ryukyus),Mikaeel Ahmadi(University of the Ryukyus),Sergio Bernardo Viegas(University of the Ryukyus),Urasaki Naomitsu(University of the Ryukyus),Senju Tomonobu(University of the Ryukyus)

キーワード: Power flow analysis|Distributed genertion|Capacitor banks|renewable energy|Genetic algorithm|Newton-Raphson

要約(日本語): In this study, renewable energy based distributed generation system is considered for voltage improvement. After a brief presentation of our target network, load flow problem will be applied to determine the voltage at each bus considering daily mean load variation for a whole day. Then we proceed to optimal sizing and location of our distributed generation system consisting of ve production units and ve capacitor banks. Aside from voltage limitations, different constraints are also considered: power flow constraints, production capacity limitation but also capacitor banks limits which are also considered as constraints. The simulation results show the effectiveness of our proposed system with a slightly improved voltage.

要約(英語): In this study, renewable energy based distributed generation system is considered for voltage improvement. After a brief presentation of our target network, load flow problem will be applied to determine the voltage at each bus considering daily mean load variation for a whole day. Then we proceed to optimal sizing and location of our distributed generation system consisting of ve production units and ve capacitor banks. Aside from voltage limitations, different constraints are also considered: power flow constraints, production capacity limitation but also capacitor banks limits which are also considered as constraints. The simulation results show the effectiveness of our proposed system with a slightly improved voltage.

原稿種別: 英語

PDFファイルサイズ: 13,645 Kバイト

販売タイプ
書籍サイズ
ページ数
詳細を表示する