ダイナミックス経済負荷配分の実行可能領域
ダイナミックス経済負荷配分の実行可能領域
カテゴリ: 研究会(論文単位)
論文No: PSE11098
グループ名: 【B】電力・エネルギー部門 電力系統技術研究会
発行日: 2011/09/29
タイトル(英語): Improved Feasible Operation Region for Dynamic Economic Load Dispatch
著者名: Hafiz Habibuddin(広島大学),餘利野 直人(広島大学),佐々木 豊(広島大学),造賀 芳文(広島大学)
著者名(英語): Hafiz Habibuddin(Hiroshima University),Yorino Naoto(Hiroshima University),Sasaki Yutaka(Hiroshima University),Zoka Yoshifumi(Hiroshima University)
キーワード: Dynamic economic dispatch|Feasible operation region|Optimization|Ramp-rate constraints
要約(日本語): High penetration of renewable energy in the future power system will pose a big problem to the load dispatch operation. The large disturbance and high forecast error must be considered when scheduling a limited number of controllable generators to follow rapid change in load. This paper proposes dynamic economic load dispatch (DELD) problem approach based on the concept of feasible operation region (FOR). FOR is defined as the region that committed generators may operate to match the load profile without violating the ramp-rate constraints. The DELD problem is solved in two stages. In the first stage, FOR of each generator is computed using recent real-time forecasted load as well as renewable energy generation. In the second stage, a generation schedule is determined by solving the DELD problem interval by interval while considering ramp-rate constraints and FOR constraints. The method can gives feasible solution for feasible load and specify the amount of compensation required for feasible solution for infeasible load.
要約(英語): High penetration of renewable energy in the future power system will pose a big problem to the load dispatch operation. The large disturbance and high forecast error must be considered when scheduling a limited number of controllable generators to follow rapid change in load. This paper proposes dynamic economic load dispatch (DELD) problem approach based on the concept of feasible operation region (FOR). FOR is defined as the region that committed generators may operate to match the load profile without violating the ramp-rate constraints. The DELD problem is solved in two stages. In the first stage, FOR of each generator is computed using recent real-time forecasted load as well as renewable energy generation. In the second stage, a generation schedule is determined by solving the DELD problem interval by interval while considering ramp-rate constraints and FOR constraints. The method can gives feasible solution for feasible load and specify the amount of compensation required for feasible solution for infeasible load.
原稿種別: 日本語
PDFファイルサイズ: 926 Kバイト
受取状況を読み込めませんでした