再生可能エネルギー大量導入時の発電機起動停止計画における起動台数のとりうる範囲と需給バランスの関係
再生可能エネルギー大量導入時の発電機起動停止計画における起動台数のとりうる範囲と需給バランスの関係
カテゴリ: 論文誌(論文単位)
グループ名: 【B】電力・エネルギー部門
発行日: 2016/11/01
タイトル(英語): Relationship between Supply-demand Balance and Domain of Existence of the Number of Connected Generators for Determining Unit Commitment in Power System with a Large Integration of Renewable Energy Sources
著者名: 益田 泰輔(名城大学理工学部電気電子工学科),福見 拓也((一財)エネルギー総合工学研究所),Joao Gari da Silva Fonseca Junior(東京大学生産技術研究所),大竹 秀明((独)産業技術総合研究所),村田 晃伸((独)産業技術総合研究所)
著者名(英語): Taisuke Masuta (Dept. of Electrical and Electronic Engineering, Faculty of Science and Technology, Meijo University), Takuya Fukumi (The Institute of Applied Energy (IAE)), Joao Gari da Silva Fonseca Junior (Institute of Industrial Science, the University of Tokyo), Hideaki Ootake (National Institute of Advanced Industrial Science and Technology (AIST)), Akinobu Murata (National Institute of Advanced Industrial Science and Technology (AIST))
キーワード: 再生可能エネルギー,供給力不足,電力余剰,発電予測,発電機起動停止計画 renewable energy sources,power shortfall,power surplus,generation forecast,unit commitment (UC)
要約(英語): In general, conventional power generators, which are scheduled to operate in unit commitment (UC) planning based on power generation and demand forecasts, have their output regulated to maintain the power balance and to minimize their operational cost for demand and supply operation in power systems. The number of operating (connecting) generators determines whether the power balance can be maintained or not. During load dispatch, it is difficult to start-up or stop generators at once for securing regulating capacity. A power surplus occurs if outputs less than the minimum outputs are requested of the connected generators, whereas a power shortfall occurs if outputs greater than the maximum outputs are requested. In this study, we analyze the relationship between the supply-demand balance and the domain of the existence of the number of connected generators for determining UC in a power system with a large integration of renewable energy sources. Moreover, we discuss quantitatively the impact of the power system conditions on the supply-demand balance using two-dimensional diagrams and numerical simulations.
本誌: 電気学会論文誌B(電力・エネルギー部門誌) Vol.136 No.11 (2016)
本誌掲載ページ: 809-816 p
原稿種別: 論文/日本語
電子版へのリンク: https://www.jstage.jst.go.jp/article/ieejpes/136/11/136_809/_article/-char/ja/