商品情報にスキップ
1 1

製造リードタイムに関する数理解析考察―生産系におけるデッドラインスケジューリングの応用―

製造リードタイムに関する数理解析考察―生産系におけるデッドラインスケジューリングの応用―

通常価格 ¥770 JPY
通常価格 セール価格 ¥770 JPY
セール 売り切れ
税込

カテゴリ: 論文誌(論文単位)

グループ名: 【C】電子・情報・システム部門

発行日: 2012/12/01

タイトル(英語): A Study on Mathematical Analysis of Manufacturing Lead Time―Application for Deadline Scheduling in Manufacturing System―

著者名: 白井 健二(新潟国際情報大学),天野 佳則((株) 京南エレクス)

著者名(英語): Kenji Shirai (Niigata University of International and Information Studies), Yoshinori Amano (Kyohnan Elecs co., LTD.)

キーワード: 製造リードタイム,製造リードタイム適合条件,対数正規型確率微分方程式,マルチンゲール,リスク中立化積分  manufacturing lead time,manufacturing lead-time compatibility constraint,stochastic differential equations of log-normal type,martingale,risk-neutral integral

要約(英語): In this present paper, we apply a stochastic differential equation(SDE) for mathematical model which describes manufacturing process from input materials to an end of manufacturing process. We utilize a risk-neutral principal in stochastic calculus based on the SDE. We extend the mathematical model to allow for objective evaluation. In order to improve a lead-time in manufacturing process, we introduce a evaluation equation which satisfy a certain compatibility constraint with lead-time. A certain compatibility constraint with lead-time means a strategy, that is, "Cut off irrelevant process in entire process, and Bring back its improved the process".It is assumed that the probability density function of log-normal type which is a probability density function from input materials to an end of process. This present paper evaluate a certain compatibility constraint with lead-time by applying the risk neutrality and martingale measure of stochastic integral under this assumption.After its evaluation value calculated by a evaluation equation, a process control system evaluates the each sub-process, and reschedules to improve the utilization efficiency of the entire manufacturing process.Thus, a front-end-process is to cancel the request to the process, and follows the instructions on the process control systems. But, this present paper gives only simulation evaluation calculated the parameter, the paper does not discuss a compatibility between a evaluation value of calculated manufacturing lead-time compatibility constraint and a the real system.However, this present paper gives a idea to search bottleneck sub-process in the manufacturing process, and gives a idea of software tool for process synchronization.

本誌: 電気学会論文誌C(電子・情報・システム部門誌) Vol.132 No.12 (2012) 特集:電気関係学会東海支部連合大会

本誌掲載ページ: 1973-1981 p

原稿種別: 論文/日本語

電子版へのリンク: https://www.jstage.jst.go.jp/article/ieejeiss/132/12/132_1973/_article/-char/ja/

販売タイプ
書籍サイズ
ページ数
詳細を表示する