商品情報にスキップ
1 1

Implementation of Special Protection Scheme (SPS) and construction Battery Energy Storage System (BESS) -Smart Grid Demonstration Project in Poland to improve power system protection in case of high penetration of renewable energy-

Implementation of Special Protection Scheme (SPS) and construction Battery Energy Storage System (BESS) -Smart Grid Demonstration Project in Poland to improve power system protection in case of high penetration of renewable energy-

通常価格 ¥440 JPY
通常価格 セール価格 ¥440 JPY
セール 売り切れ
税込

カテゴリ: 全国大会

論文No: 6-083

グループ名: 【全国大会】平成30年電気学会全国大会論文集

発行日: 2018/03/05

タイトル(英語): Implementation of Special Protection Scheme (SPS) and construction Battery Energy Storage System (BESS) -Smart Grid Demonstration Project in Poland to improve power system protection in case of high penetration of renewable energy-

著者名: Shintaro Ueno(Hitachi, Ltd.),Hiroshi Tanso(Hitachi, Ltd.),Shohei Takahashi(Hitachi, Ltd.),Takafumi Morishige(Hitachi, Ltd.),Hiroyuki Sugiyama(Chugoku Electric Power Co., Inc.),Tatsuya Moriyama(Chugoku Electric Power Co., Inc.),Robert Tr?bski(Polskie Sieci Elektroenergetyczne S.A.),?ukasz Szczepaniak(Polskie Sieci Elektroenergetyczne S.A.)

著者名(英語): Shintaro Ueno(Hitachi, Ltd.),Hiroshi Tanso(Hitachi, Ltd.),Shohei Takahashi(Hitachi, Ltd.),Takafumi Morishige(Hitachi, Ltd.),Hiroyuki Sugiyama(Chugoku Electric Power Co., Inc.),Tatsuya Moriyama(Chugoku Electric Power Co., Inc.),Robert Trebski(Polskie Sieci Elektroenergetyczne S.A.),Lukasz Szczepaniak(Polskie Sieci Elektroenergetyczne S.A.)

キーワード: 系統安定化,蓄電池,潮流混雑

要約(日本語): Driven by the climate policy, the installation of windfarm is reached level of 6,000MW in Poland especially in northern area. Since the windfarm generation is unpredictable and uncontrollable, the increase of windfarm is concerned that it causes grid stability problems such as the occurrence of overloads or the lack of reserve capacity. In this project, SPS system (hereinafter “SPS”) and Battery Energy Storage System (hereinafter “BESS”) will be installed in order to solve the problems. The article presents the main objectives and assumptions of the project implemented within the framework of Polish-Japanese cooperation.

原稿種別: 英語

PDFファイルサイズ: 384 Kバイト

販売タイプ
書籍サイズ
ページ数
詳細を表示する